Customer :

Pacific Beachcomber

Role :

Main Contractor

Key date :

2010 - 2012

Location :

TETIAROA - TAHITI - Tahiti

Description of the Project

Construction of a SWAC, 3310m long HDPE deep water intake down to 960m water depth:

Work done and added value of our solution

  • Number of Lines: 2 (1 x intake pipe + 1 x outfall pipe)
  • Trench Length: 650m (lagoon) + 250m (ocean)
  • Total Pipeline Length: 310m (2580m for intake and 730m for outfall)
  • Diameter: 450mm OD (both intake & outfall pipes)
  • Max Water Depth: 960m for intake pipe, 30m for outfall pipe

Pipe Specifications: HDPE PE 100 wel ded from 11,8m sections