Description of the Project

EPCI contract for 30’’ import crude oil sealine and PLEM.

 

Work done and added value of our solution

Pipeline Installation

  • Number of Pipelines                  1
  • Length of Line                                2.300m / 23m water depth
  • Diameter                                           30’’
  • Specific Constraints                    Shore pull and Shallow Water S-Lay
  • Pipe Specification                         X60 – 3LPE – CWC

The shore crossing has been performed using SuperMax marine excavator.

Back to the references

  • SONARA, GEOCEAN, offshore, barge, PROTIS, oil pipeline, supermax

SuperMax Marine Excavator