Customer :
SONARA
Role :
Main Contractor
Key date :
2017
Location :
SONARA Refinery, Limbé, Cameroon - Cameroon
Description of the Project
EPCI contract for 30’’ import crude oil sealine and PLEM.
Work done and added value of our solution
Pipeline Installation
- Number of Pipelines 1
- Length of Line 2.300m / 23m water depth
- Diameter 30’’
- Specific Constraints Shore pull and Shallow Water S-Lay
- Pipe Specification X60 – 3LPE – CWC
The shore crossing has been performed using SuperMax marine excavator.