Customer :

EDRA

Role :

Main Contractor

Key date :

2016-2017

Location :

Port Saïd - EGYPT - Egypt

Description of the Project

Power Plant Pipelines Replacement

Work done and added value of our solution

  • Number of Lines: 6
  • Trench Length: 130ml x 12m for the Intake Lines + 180ml x 15m for the Outfall Lines
  • Total Pipeline Length:

           Intake   2 x 115m

          Outfall   2 x 160m

          Chlorination line   2 x 145m

  • Diameter: DN2500 for the Intake and Outfall Lines and DN200 for the Chlorination Lines
  • Max Water Depth:-6m/MSL
  • Pipe Specifications: HDPE Pipes PE100