Customer :
BHP BILLITON
Role :
Main Contractor
Key date :
2014 - 2016
Location :
ANTOFAGASTA - CHILI - Chile
Description of the Project
Construction of intake & outfall lines for a SWRO desalination plant for the mining industry
Work done and added value of our solution
- 2 water intake lines built by micro tunnelling and ended by risers in GRP installed in 7m diameter, 11m deep shafts covered with concrete intake heads of 450 Tons.
*530m length overall each, ID 2m
- 1 water discharge line built by micro tunnelling and ended by riser in GRP installed in 7m diameter, 11m deep shaft and connected to 2 x OD1600mm OD twin HDPE multiport diffusers, 90m long, laid on the seabed.
*350m length overall, ID 2m