Customer :
EXCELERATE ENERGY
Role :
Main Contractor
Key date :
2017-2019
Location :
Maheshkhali Island - Bangladesh
Description of the Project
EPCI of the first LNG floating storage and regasification terminal (FSRU)
Work done and added value of our solution
Offshore Terminal & Gas Pipeline Installation
-
Number of Pipelines 1 x Import Gas Line
-
Length of Line 7,500m / 40m water depth
-
Diameter 24’’
-
Plug specifications Plug Mooring System
-
Number of anchors 8 Suction Piles & 3 Holdback Anchors
-
Mooring Lines Mixed PE & Chains