Customer :
Pacific Beachcomber
Role :
Main Contractor
Key date :
2010 - 2012
Location :
TETIAROA - TAHITI - Tahiti
Description of the Project
Construction of a SWAC, 3310m long HDPE deep water intake down to 960m water depth:
Work done and added value of our solution
- Number of Lines: 2 (1 x intake pipe + 1 x outfall pipe)
- Trench Length: 650m (lagoon) + 250m (ocean)
- Total Pipeline Length: 310m (2580m for intake and 730m for outfall)
- Diameter: 450mm OD (both intake & outfall pipes)
- Max Water Depth: 960m for intake pipe, 30m for outfall pipe
Pipe Specifications: HDPE PE 100 wel ded from 11,8m sections