Bora-Bora: Installation of a deep-water SWAC for the Intercontinental Hotel
TBSA chose Geocean to oversee the engineering, procurement, construction, and installation of the deep-water intake pipeline for the SWAC at the Intercontinental Bora Bora Thalasso & Spa.
-
Location Bora-Bora, TAHITI
-
Solution Sustainable heating and cooling solutions
-
Key date 2020 - 2022
-
Customer TBSA
Despite the hotel operating at full capacity, our team completed the project without disrupting business operations or compromising the quality of the guests’ stays.
Engineering, procurement, construction and installation of a seawater air-conditioning system
- Offshore survey
- 1 x HDPE PE100 DN400 intake pipe, approx. 1,900 m long to a depth of 860 m, stabilised with concrete collars and ballast chains.
- Underwater work and connection to a water depth of 50 m.
- Performance tests and final inspections